DRAFT MASTER ENVIRONMENTAL IMPACT REPORT FOR CORBIN AND NORDHOFF REDEVELOPMENT PROJECT

 

LEAD AGENCY:

CITY OF LOS ANGELES

SCH #:

2002051125

PROJECT LOCATION:

19601 NORDHOFF STREET, LOS ANGELES

NORTHEAST CORNER OF NORDHOFF STREET

AND CORBIN AVENUE

 

 

PROJECT DESCRIPTION

This Master Environmental Impact Report (MEIR) is intended to assess the probable impacts of the redevelopment of an area undergoing a General Plan Amendment and Zone Change. The General Plan Amendment and Zone Change request was initiated by the owners of the property located at 19601 Nordhoff Street, Los Angeles, California. A subsequent area with similar zoning and General Plan designation was requested to be reviewed by the City of Los Angeles Department of City Planning. These areas are referred to as the Project Site and Add Area, respectively. The Project Site includes approximately 35.5 acres located at the northeast corner of Nordhoff Street and Corbin Avenue. The Add Area includes of approximately fifteen parcels, totaling approximately fifteen acres, located to the north of the Project Site across Prairie Street, between Corbin Avenue and Shirley Avenue.

 

 

DRAFT MASTER ENVIRONMENTAL IMPACT REPORT – DOCUMENT INFORMATION

 

      Graphic files are provided in Adobe Portable Document Format (PDF).

 

 

DRAFT MASTER ENVIRONMENTAL IMPACT REPORT – LIST OF FIGURES

 

 

     1.       Regional Map (1.51m)

        2.       Vicinity Map (1.31m)

        3.       Radius Map (873k)

        4.       Aerial Photograph (4.38m)

        5.       Related Projects (3.28m)

        6.       Views from Shirley Avenue (3.22m)

        7.       Views from Nordhoff Street (3.64)

        8.       Views from Prairie Street (3.58m)

        9.       Views from Corbin Avenue (3.28m)

      10.       Views of Add Area I (2.43m)

      11.       Views of Add Area II (3.36m)

      12.       SCAB Location and Boundaries (814k)

      13.       Air Monitoring Areas (740k)

      14.       Sensitive Receptor Locations (610k)

      15.       Geologic Map (3.50m)

      16.       Regional Faults (959k)

      17.       Regional Seismicity (3.86m)

      18.       Seismic Hazard Zone Map (1.66m)

      19.       Hydrologic Subareas (913k)

      20.       Long Range Land Use Diagram San Fernando Valley (1.95m)

      21.       General Plan (2.12m)

      22.       Noise Monitoring Positions (584k)

      23.       Public Facilities Map (1.71m)

      24.       Parkland (2.22m)

      25.       Existing Traffic Volumes AM and PM Peak Hours (3.76m)

      26.       Project Traffic Volumes AM and PM Peak Hours Scenario 1: Retail, Project Site Only (3.13m)

      27.       Project Traffic Volumes AM and PM Peak Hours Scenario 2: Office, Project Site Only (3.11m)

      28.       Project Traffic Volumes AM and PM Peak Hours Scenario 3: Retail/Residential, Project Site Only (3.11m)

      29.       Project Traffic Volumes AM and PM Peak Hours Scenario 4: Office/Residential, Project Site Only (3.08m)

      30.       Related Project Traffic Volumes AM and PM Peak Hours (3.15m)

      31.       Future Traffic Volumes AM and PM Peak Hour With Scenario 1: Retail, Project Site Only (3.72m)

      32.       Future Traffic Volumes AM and PM Peak Hour With Scenario 2: Office, Project Site Only (3.67m)

      33.       Future Traffic Volumes AM and PM Peak Hour With Scenario 3: Retail/Residential, Project Site Only (3.73m)

      34.       Future Traffic Volumes AM and PM Peak Hour With Scenario 4: Office/Residential, Project Site Only (3.72m)

      35.       Project Traffic Volumes AM and PM Peak Hours Scenario 1: Retail, Full Build Out (3.11m)

      36.       Project Traffic Volumes AM and PM Peak Hours Scenario 2: Office, Full Build Out (3.14m)

      37.       Project Traffic Volumes AM and PM Peak Hours Scenario 3: Retail/Residential, Full Build Out (3.15m)

      38.       Project Traffic Volumes AM and PM Peak Hours Scenario 4: Office/Residential, Full Build Out (3.11m)

      39.       Future Traffic Volumes AM and PM Peak Hour With Scenario 1: Retail, Full Build-Out (3.71m)

      40.       Future Traffic Volumes AM and PM Peak Hour With Scenario 2: Office, Full Build-Out (3.78m)

      41.       Future Traffic Volumes AM and PM Peak Hour With Scenario 3: Retail/Residential, Full Build Out (4m)

      42.       Future Traffic Volumes AM and PM Peak Hour With Scenario 4: Office/Residential, Full Build Out (3.62m)

           

 

Planning Associates, Inc. (2003)